Boral Crushing Plant Dunnstown
Completed 2011
Client: Rocktec
SS Electrics provided a complete turn-key solution to the Boral Crushing Plant in Dunnstown, Victoria in 2010/11. With a construction value of approximately $32 million, SS Electrics was responsible for the design and installation of the underground conduit system, all control network systems, cabling and trays throughout the plant. Our team designed the rock crushing control system and completed the design and installation of e-stop safety and lanyard systems including a unique lock-out isolation system. Field lighting completed the job.